What is Shrinkage Cracks in Concrete? -Types and Causes of Shrinkage Cracks


Shrinkage cracks in concrete occur due to change in moisture of concrete. Concrete and mortar are porous in their structure in the form of inter-molecular space. They expand when they absorb the moisture and shrink when they dry. This is the main cause of concrete shrinkage cracks on drying.
Shrinkage of concrete is an irreversible process.

Types of Shrinkage in Concrete

There are two types of shrinkage in concrete:
  1. Initial Shrinkage
  2. Plastic Shrinkage
Shrinkage Cracks in Concrete

Initial Shrinkage Cracks in Concrete

Initial shrinkage cracks in concrete normally occurs in all building materials or components that are cement/lime based such as concrete, mortar, masonry units, masonry and plaster etc. and is one of the main cause of cracking in structure.
Initial shrinkage in concrete and mortar occurs during construction of structural member due to drying out of moisture. The initial shrinkage of concrete is partly reversible if the moisture is maintained in concrete, but it becomes irreversible when concrete becomes dry.
During curing, due to subsequent wetting and drying this shrinkage exceeds and crack is developed in concrete.
Extent of Initial Shrinkage in Concrete
The extent of initial shrinkage in cement concrete and cement mortar depends on a number of factors namely :
a) Cement content –It increases with richness of mix.
b) Water content – Greater the water quantity used in the mix, greater is the shrinkage.
c) Maximum size, grading & quality of aggregate –With use of largest possible max. size of aggregate in concrete and with good grading, requirement of water for desired workability is reduced, with consequent less shrinkage on drying due to reduction in porosity. E.g., for the same cement aggregate ratio, shrinkage of sand mortar is 2 to 3 times that of concrete using 20 mm maximum size aggregate and 3 to 4 times that of concrete using 40 mm maximum size aggregate.
d) Curing –if the proper curing is carried out as soon as initial set has taken place and is continued for at least 7 to 10 days then the initial shrinkage is comparatively less. When the hardening of concrete takes place under moist environment there is initially some expansion which offsets a part of subsequent shrinkage.
e) Presence of excessive fines in aggregates –The presence of fines increases specific surface area of aggregate & consequently the water requirement for the desire workability, with increase in initial shrinkage.
f) Chemical composition of cement – Shrinkage is less for the cement having greater proportion of tri-calcium silicate and lower proportion of alkalis i.e. rapid hardening cement has greater shrinkage than ordinary port-land cement.
g) Temperature of fresh concrete and relative humidity of surroundings – With reduction in the surrounding temperature the requirement of water for the same slump/workability is reduced with subsequent reduction in shrinkage. Concreting done in mild winter have much less cracking tendency than the concreting done in hot summer months. In cement concrete 1/3rd of the shrinkage take place in the first 10 days, ½ within one month and remaining ½ within a year time. Therefore, shrinkage cracks in concrete continue to occur and widens up to a year period.

Plastic Shrinkage Cracks in Concrete

Plastic shrinkage in concrete occurs immediately after concrete has been placed due to settlement of large solid particles by gravity action. Due to this, water in the concrete rises to the surface. This process is also called bleeding of concrete. Bleeding in concrete continues till the layer of water on the surface of concrete has set.
As long as the rate of evaporation is lower than the rate of bleeding, there is a continuous layer of water at the surface known as “water sheen”, and shrinkage does not occur.
When the concrete surface loses water faster than the bleeding action bring it to the top, shrinkage of top layer takes place, and since the concrete in plastic state can’t resist any tension, cracks develops on the surface. These cracks are common in slabs.
The extent of plastic shrinkage depends on:
  • Temperature of concrete,
  • Exposure to the heat from sun radiation,
  • Relative humidity of ambient air and velocity of wind.

Types of Design and Detailing Errors in Construction and their Prevention


Common design and detailing errors in construction arises due to either inadequate structural design or due to lack of attention to relatively minor design details.

Types of Design and Detailing Errors in Construction and their Prevention

Types of Design and Detailing Errors in Construction and their Prevention
Following are the different design and detailing errors in construction, their symptoms and prevention methods:

(1) Inadequate structural design

Due to inadequate structural design the concrete is exposed to greater stress than it can handle or strain in concrete increases more than its strain capacity and fails.
The symptoms of such kind of failures due to inadequate structural design shows either spalling of concrete or cracking of concrete. Excessively high compressive stress due to inadequate structural design results in spalling of concrete. Also, high torsion or shear stresses results in spalling or cracking of concrete. High tensile stresses also results in cracking of concrete.
To identify the inadequate design as cause of the structural damage, the structure shall be inspected and locations of the damage should be compared to the types of stresses that should be present in the concrete. For rehabilitation projects, thorough petrographic analysis and strength testing of concrete from elements to be reused will be necessary.
Prevention: Inadequate structural design can be prevented by thorough and careful review of all design calculations. Any rehabilitation method that makes use of existing concrete structural members must be carefully reviewed.
Design and Detailing Errors in Construction

(2) Poor design details

Poor design details can cause localized concentration of high stresses in structural members even if the design is adequate to meet the requirements. These high stresses may lead to cracking of concrete that allows water or chemicals to pass through the concrete. Thus poor design detail may lead to seepage through the structural members.
Poor design detail may not lead to structural failure, but it can become the cause of deterioration of concrete. These problems can be prevented by a thorough and careful review of plans and specifications for the construction work.
Types of poor design detailing and their possible effects on structures are discussed below:

(a) Abrupt changes in section:

Abrupt changes in section may cause stress concentrations that may result in cracking. Typical examples would include the use of relatively thin sections rigidly tied into massive sections or patches and replacement concrete that are not uniform in plan dimensions.

(b) Insufficient reinforcement at corners and openings:

Corners and openings also tend to cause stress concentrations that may cause cracking. In this case, the best prevention is to provide additional reinforcement in areas where stress concentrations are expected to occur.

(c) Inadequate provision for deflection:

Deflections in excess of those anticipated may result in loading of members or sections beyond the capacities for which they were designed. Typically, these loadings will be induced in walls or partitions, resulting in cracking.

(d) Inadequate provision for drainage:

Poor attention to the details of draining a structure may result in the ponding of water. This ponding may result in leakage or saturation of concrete. Leakage may result in damage to the interior of the structure or in staining and encrustations on the structure. Saturation may result in severely damaged concrete if the structure is in an area that is subjected to freezing and thawing.

(e) Insufficient travel in expansion joints:

Inadequately designed expansion joints may result in spalling of concrete adjacent to the joints. The full range of possible temperature differentials that a concrete may be expected to experience should be taken into account in the specification for expansion joints. There is no single expansion joint that will work for all cases of temperature differential.

(f) Incompatibility of materials:

The use of materials with different properties (modulus of elasticity or coefficient of thermal expansion) adjacent to one another may result in cracking or spalling as the structure is loaded or as it is subjected to daily or annual temperature variations.

g) Neglect of creep effect:

Neglect of creep may have similar effects as described for inadequate provision for deflections. Additionally, neglect of creep in prestressed concrete members may lead to excessive prestress loss that in turn results in cracking as loads are applied.

(h) Rigid joints between precast units:

Designs utilizing precast elements must provide for movement between adjacent precast elements or between the precast elements and the supporting frame. Failure to provide for this movement can result in cracking or spalling.

(i) Unanticipated shear stresses in piers, columns, or abutments:

If, through lack of maintenance, expansion bearing assemblies are allowed to become frozen, horizontal loading may be transferred to the concrete elements supporting the bearings. The result will be cracking in the concrete, usually compounded by other problems which will be caused by the entry of water into the concrete.

(j) Inadequate joint spacing in slabs:

This is one of the most frequent causes of cracking of slabs-on-grade.

Monday, June 4, 2018

Reinforced Concrete Slab Design and Detailing Guide IS456: 2000


Reinforced concrete slab design and detailing guidelines for depth of slab, loads on slab, reinforcement guide for one-way and two-way slabs as per IS 456:2000 have been tried to present here.
Following are the RCC Slab Design and Detailing guidelines:

Reinforced Concrete Slab Design Guidelines

a) Effective span of slab:

Effective span of slab shall be lesser of the two
  1. L = clear span + d (effective depth)
  2. L = Center to center distance between the support

b) Depth of slab:

The depth of slab depends on bending moment  and deflection  criterion.  the trail depth can be obtained using:
  • Effective depth d= Span /((L/d)Basic x modification factor)
  • For obtaining modification factor, the percentage of steel for slab can be assumed from 0.2 to 0.5%.
  • The effective depth d of two way slabs can also be  assumed using cl.24.1,IS 456 provided short span is <3.5m and loading class is <3.5KN/m2
Type of supportFe-250Fe-415
Simply supportedL/35L/28
Continuous supportL/40L/32
Or, the following thumb rules can be used:
  • One way slab d=(L/22) to (L/28).
  • Two way simply supported slab d=(L/20) to (L/30)
  • Two way restrained slab d=(L/30) to (L/32)

c) Load on slab:

The load on slab comprises of Dead load, floor finish and live load. The loads are calculated per unit area (load/m2).
Dead load = D x 25 kN/m2 ( Where D is thickness of slab in m)
Floor finish (Assumed as)= 1 to 2 kN/m2
Live load (Assumed as) = 3 to 5 kN/m2(depending on the occupancy of the building)
concrete-slab

Detailing Requirements of Reinforced Concrete Slab as per IS456: 2000

a) Nominal Cover:

For Mild exposure – 20 mm
For Moderate exposure – 30 mm
However, if the diameter of bar do not exceed 12 mm, or cover may be reduced by 5 mm. Thus for main reinforcement up to 12 mm diameter bar and for mild exposure, the nominal cover is 15 mm.

b) Minimum reinforcement:

The reinforcement in either direction in slab shall not be less than
  • 0.15% of the total cross sectional area for Fe-250 steel
  • 0.12% of the total cross-sectional area for Fe-415 & Fe-500 steel.

c) Spacing of bars:

The maximum spacing of bars shall not exceed
  • Main Steel – 3d or 300 mm whichever is smaller
  • Distribution steel –5d or 450 mm whichever is smaller Where, ‘d’ is the effective depth of slab. Note: The minimum clear spacing of bars is not kept less than 75 mm (Preferably 100 mm) though code do not recommend any value.

d) Maximum diameter of bar:

The maximum diameter of bar in slab, shall not exceed D/8, where D is the total thickness of slab.

CIVIL ENGINEERING INTERVIEW QUESTIONS


Building materials and Construction
What are the dimensions of the standard brick? 
What are thin shell roofs? Why are they becoming popular? 
Name the different types of retaining walls
Structural Analysis
What is buckling or crippling load? 
Define slenderness ratio. What is its effect on design of compression members? 
What is meant by specific yield and specific retention? 
Shear force and BM diagrams for different types of loadings on beams
Mechanics of structures
Differentiate between bending moment and twisting moment 
Differentiate between mild steel and HYSD bars 
Differentiate between proof resilience and modulus of resilience 
What is meant by strain energy?
Fluid Mechanics
What is a spillway? 
What is total energy line? 
What is a flow net? Discuss its uses 
Why isn’t a venturimeter used commonly for measuring discharge in houses? 
What is critical hydraulic gradient? 
Differentiate between weir, notch and barrage
Geotechnical Engineering
What is geosynthetics? Mention its applications in civl engineering field 
What do you understand by 80/100 bitumen? 
Which is commonly used-bitumen or tar? Why? 
What are the precautions to be taken for construction in marshy soil? 
What is the relation between submerged unit weight and submerged weight? 
What are the different types of foundations adopted for different soils? 
What is differential settlement? 
Discuss the importance of Attenbug’s limits in soil engineering 
Differentiate between activity and sensitivity of soils 
Differentiate between soil stabilization and ground improvement 
How does machine foundation differ from an ordinary foundation? 
What is the permanent solution applied for the restoration of leaning Tower of Pisa?
Reinforced Concrete Structures
What is pre stressed concrete? What are its ingredients? 
What do 53 stand for in 53-grade cement? 
How do you construct a 25 storey building with no columns? 
What are the loads to be considered for the design of bridges? 
Differentiate between pre-tensioning and post-tensioning 
What is the L/D ratio of a cantilever beam? 
What type of dam is the Idukki dam? Give its details and peculiarity.
Transportation Engineering
What is camber? 
What is cutback bitumen? What are its special uses? 
Draw a typical C.S. of a permanent way 
What does IRC stand for? 
Define angularity number and give practical applications 
What material as ballast would you suggest for a high speed track? Why? 
What is the usual width of a single lane and a double lane road?
Environmental Engineering
Distinguish between slow and rapid sand filters 
What is super chlorination? 
What is canopy? 
Differentiate between BOD and COD 
Advanced Construction and Construction Technology 
What is batching? Differentiate between volume and weight batching 
How is underwater concreting carried out? 
What are the forces involved in underwater construction? 
What do 20 stand for in M20 mix concrete?
Engineering Geology
What is littoral drift? 
Differentiate between faults and folds
Surveying
How is a theodolite leveled? 
What are advantages of electronic theodolite over transit theodolite? 
Give the standard lengths of chains used in surveying 
What is a benchmark? Name the different types